What's Included
$17.2 million for 728 street segments - A street segment is a portion of a street defined from intersection to intersection- basically each block. These streets were identified for inclusion by the City's pavement management system. The street listing was identified at Council meetings and actions that led to the justification for a ballot initiative. $10.08 million for ADA upgrades - Federal Law requires City's to bring its facilities into compliance with the Americans with Disabilities Act (ADA) when it performs rehabilitation work to infrastructure (i.e. streets). Activities such as asphalt overlay or road reconstruction require that additional work be completed to bring accessory components (i.e. curb ramps) into compliance with current standards. Work such as pothole repair and slurry seals are considered maintenance and do not meet the threshold to mandate compliance.

$2.72 million for storm drain repair - Work has been identified to bring the lowest rated storm drain pipes into a state of good repair (approximately 5400 lf). Additional funding was identified to maintain storage ponds and replace pumping infrastructure.

$2 million for sidewalk repairs - Sidewalk work will be performed to repair the highest prioritized sidewalk displacement (type 3- displaced more than 3/4").

What's Not Included
Traffic Calming Measures - The funding was identified to rehabilitate existing street infrastructure. Traffic calming does not fit in that description. Items such as bulb-outs at intersections will be 'driven' by the need to make ADA ramps compliant.

Curb and Gutter Repair - Functional curb and gutters will not be replaced even if it is not aesthetically pleasing.

Driveways - With vary minor exceptions, work on driveways will not occur (the exception is to meet compliance for an ADA corner ramp and there is a conflict with an existing ramp).

Neighborhoods - In general terms, work will occur on the eastern and western ends of the City and work will progress towards the center.
  • Street segments will be field evaluated to confirm the appropriate treatment.
  • Areas that are to receive maintenance work (slurry), will be packaged together for construction. The anticipation is that two slurry packages will go out each of the four years (spring and fall). It is very likely that the slurry work will occur on a City wide basis.
  • Areas to receive rehabilitation will be analyzed for ADA compliance.
  • ADA ramp design and construction will occur.
  • When compliance is achieved, a paving package will be prepared and work will occur. Paving work will likely be more concentrated to specific areas.

THANK YOU! Thank you for getting involved in the City of Monterey Measure S - Fixing Streets program. We hope this page gives you the information you are looking for. If you have any further questions, please don't hesitate to contact us.



FUN FACTS
  • The total amount of slurry seal placed was 1.28 million square feet. This equates to almost 30 acres or a little more than 22 football fields.
  • The total number of streets that will be touched by Measure P is a little more than 9 million square feet.
  • All public works projects have a one year warranty. If you have feedback about the work done, please let us know. Call us at 646-3448, email us at Suggest@monterey.org, or complete the online comment form.

As of April 1, 2019 - Measure P is now Measure S
Measure-P-is-now-Measure-S

Measure-S-Thank-You

Quick Facts
Resolution establishing the Measure S Oversight Committee

Measure S was approved by 82% of voters in November, 2018 as a continuation of Measure P. It authorized a 1% local district tax (sales and use tax) to be used “to address significant deferred maintenance by fixing streets, sidewalks, and potholes; improve related access and safety for senior citizens, disabled residents, and others; and repair its 100-year-old storm drain system to protect our beaches/Monterey Bay.”

Measure P was approved by 74% of voters in November, 2014, and expired in March 2019.

WHEN SHOULD IT BE COLLECTED?
The tax is effective from April 1, 2019 through March 31, 2027.

WHAT IS THE TOTAL TAX RATE IN THE CITY OF MONTEREY?
  • The California base sales and use tax rate is 7.25%
  • Measure S enacted a 1% sales tax
  • Monterey-Salinas Transit’s .125% district tax – for information about this tax, please contact MST directly
  • Measure X enacted a .375% Transportation Safety and Investment Plan sales tax – for information about this tax, please contact TAMC directly
  • Effective April 1, 2017, City of Monterey total tax rate is 8.75%
WHERE CAN I GET MORE INFORMATION?
  • The California Board of Equalization has information on collecting and remitting sales and use taxes, including current tax rates on its website at www.boe.ca.gov.
  • For information on who is responsible for collecting district taxes and the difference between State sales tax and district taxes, see BOE Publication 44 at www.boe.ca.gov/pdf/pub44.pdf.
  • The City of Monterey's Fixing Streets web page has much more information on the construction. Find it at monterey.org/FixingStreets

Related Maps and more
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

MEASURE S NEW MAP UPDATES4 documents

  • MEASURE S
    document seq 0.00
    Paving Work Scheduled Spring/Summer 2021
  • MEASURE S
    document seq 0.00
    Streets to be Completed by 12/2021
  • MEASURE S
    document seq 0.00
    Streets Completed as of 10/2020
  • MEASURE S
    document seq 0.00
    Measure S Roads 5-Year Plan

PCI STATUS, APRIL 20211 document

  • PCI OF 69
    document seq 0.00
    Pavement Condition Index (PCI) Status, as of April, 2021

Annual Reports to Council4 documents

  • PowerPoint Presentation
    document seq 0.00
  • Report to Council
    document seq 0.00
  • Financial Report
    document seq 0.00
  • List of Streets from Mar 2016 - Jun 2019
    document seq 0.00