This project is for furnishing all
labor, equipment, and materials required for the removal of segments
of galvanized iron pipe water lines and installation of
approximately 1448 lineal feet (LF) of new copper pipe water lines
of various diameters in several buildings at the Presidio of
Monterey. The buildings included in this work are Buildings
209, 210, 211, 212, 213, 214, 215, and 216. Also included
in this work are necessary tie-ins to existing water laterals,
flushing and conditioning and testing of water laterals, and
miscellaneous work for complete in-place water laterals.
Possible alternate bid could include removal and disposal of
existing water laterals.
|