This project is for furnishing all
labor, equipment, and materials for Buildings 647, 650, and 651
required for the removal of existing thermostat valves from the hot
water lines, and the installation of new electronically actuated
valves and thermostats all tied to a supervisory control system.
In addition, the building mechanical rooms will be tied into the new
supervisory system.
|