-
NIP Main Page
-
Neighborhood Improvement Program Committee
-
View Agendas and Minutes on I-SEARCH Monterey
-
Meeting Schedule
-
Video archives of past meetings
-
NIP Policies and Procedures Manual in PDF
-
-
Neighborhood Traffic Calming Programs
-
Projects including Proposed Projects
Tom Reeves
City Engineer
831.646.3448
email
Kim Allen
Administrative Assistant II
831.646.3887
email
PEEC, Engineering Office
580 Pacific Street, Room 7
831.646.3921
Fax: 831.646.3405
Hours: 8 a.m. to 5 p.m., Mon. - Fri. and closed 12 to 1 for lunch
|
Recommended NIP Projects for FY 13-14
| Neighborhood |
Project Title |
Project Number |
Video Link |
Current Estimates |
View Project Descriptions |
| Aquajto Oaks |
| |
None |
|
|
|
| Alta Mesa |
| |
Don Dahvee Greenbelt Fuel Reduction |
AM-1 |
|
$25,000
|
| Casanova – Oak Knoll |
| |
COK Park Improvements |
COK-1 |

|
$25,000
|
| |
COK ADA Sidewalks |
COK-2 |

|
$67,000
|
| Deer Flats |
| |
None |
|
|
|
| Del Monte Beach |
| |
Tide/Beachway Conceal Portable Toilets |
DMB-3
|

|
$16,000
|
|
DMB Boardwalk Repair/Sand Mitigation |
DMB-6 |

|
$175,000
|
| |
Tide Ave Bike Racks |
DMB-16 |

|
$2,000
|
| Del Monte Grove – Laguna Grande |
| |
Laguna Grande Park Soccer Field Artificial Turf |
DMG-2 |

|
$200,000
|
| |
English Ave 200/300 Blk Concept Design Plan |
DMG-3 |

|
$40,000
|
| Downtown |
| |
None |
|
|
|
| Fisherman Flats |
|
FF Traffic Calming Plan |
FF-2 |

|
$60,000
|
| |
FF Greenbelt Fuel Reduction |
FF-3 |
|
$25,000
|
| Glenwood |
| |
None |
|
|
|
| Monterey Vista |
| Cut-off project |
Pacific 1200 Blk Install Curb/Gutter No Sidewalk |
MV-1 |

|
$150,000
|
| |
Quarry Park Revitalization |
MV-5 |

|
$15,000
|
| |
Monte Vista Playground Equipment |
MV-9 |

|
$40,000
|
| |
Soledad Drainage Improvement |
MV-11 |

|
$38,000
|
| New Monterey |
| |
Cypress Park Repairs/Upgrade |
NM-4 |

|
$97,000
|
| |
Scholze Ctr Meeting Rm Audio Loop Installation |
NM-5 |
|
$12,000
|
| |
Hilltop Park Landscape Renovation |
NM-8 |

|
$10,000
|
| |
Rec Trail Repairs & Landscaping |
NM-11 |
|
$50,000
|
| |
Taylor at Irving Storm Drain Upgrade |
NM-13 |

|
$155,000
|
| |
NM Ped Hawthorne/Dickman ADA , Prescott 1650
|
NM-16 |
|
$48,000
|
| |
Prescott/Devisadero Entry Improvements |
NM-18 |

|
$5,000
|
| |
Lighthouse Adaptive Traffic Signal System |
NM-20 |
|
$100,000
|
| |
Hoffman 1481 Walkway Repair |
NM-21 |

|
$14,000
|
| Oak Grove |
| |
None |
|
|
|
| Old Town |
| |
Franklin/Watson ADA Ramps |
OT-3 |

|
$180,000
|
| Skyline Forest |
| |
Wyndemere Lower Canyon Drainage Ph 2 |
SF-1 |
|
$235,000
|
| |
SF Greenbelt Fuel Reduction |
SF-2 |
|
$50,000
|
| |
SF Greenbelt Trees |
SF-3 |
|
$50,000
|
| Skyline Ridge |
| |
None |
|
|
|
| Villa Del Monte |
|
Ferrante Park Fence Repair |
VDM-1 |

|
$50,000
|
|
Ferrante Park Batting Cage Fence Repair |
VDM-2
|

|
$5,000
|
| |
VDM Revitalization/ADA Study |
VDM-4 |
|
$75,000
|
| Citywide |
|
Sollecito Ball Park Field Renovation Ph 2 |
CW-1 |

|
$200,000
|
| |
Library Community Rm Audio Loop Installation |
CW-2 |
|
$12,000
|
|
DTM Park North Side Path ADA Upgrades |
CW-3 |

|
$105,000
|
|
San Carlos Beach Shower Drain Replacement |
CW-5 |

|
$9,000
|
| |
Rec Trail Pedestrian Path Study & Signage |
CW-10 |

|
$52,000
|
| |
CERT Container Solar Radio System |
CW-11 |

|
$13,000
|
| |
DTM Train Develop Specifications |
CW-12 |
|
$35,000
|
| |
FS 1 Air Compressor |
CW-13 |

|
$8,200
|
| |
FS 3 Garage Door Widening |
CW-14 |

|
$45,000
|
| |
Corp Yd Alternate EOC Improvements |
CW-15 |

|
$32,000
|
| |
Library Public Address System |
CW-16 |
|
$28,000
|
| |
Wharf 2 Restroom Replace/Remodel |
CW-17 |

|
$150,000
|
| |
Colton Hall Restoration/Preservation |
CW-18 |

|
$140,000
|
| |
MSC Replace Surveillance System |
CW-23 |

|
$25,000
|
| |
Del Monte Median/Entryway Beautification |
CW-26 |

|
$20,000
|
| |
N Fremont Median Landscape |
CW-27 |

|
$20,000
|
| |
DTM Park Boat Structure Replacement |
CW-29 |

|
$35,000
|
|
|
|
|
|