en-USes-MX
  Search

NIP Approved Projects for FY 2012-13




Contact Us

Jeff Krebs
NIP Coordinator
(831) 646-3877
email

Pamela Renteria
Administrative Assistant II
(831) 646-3887
email

PEEC, Engineering Office

580 Pacific Street, Room 7
(831) 646-3921
Fax: (831) 646-3405
Hours: 8 a.m. to 5 p.m.,
Mon. - Fri. and closed 12 to 1 for lunch

 
Neighborhood Project Title Project Number Video Link Current Estimates

                                                               Project Descriptions

Aquajto Oaks
  109 Littlefield Rd Storm Drain Rehab  AO-01

$3,700

  Hooper Ln Resurfacing  AO-02

 $19,000

Alta Mesa
  Don Dahvee to DMC Path Improvement  AM-01

$53,000

  Don Dahvee Greenbelt Fuel Reduction  AM-03

 $25,000

Casanova – Oak Knoll
  CONA Park Center Radio Room  COK-01

 $500

  Casanova/Melway Exit Crosswalk/ADA Access  COK-02

 $215,000

  CONA Park Picnic Area Improvements  COK-03

 $35,000

  41 Melway Cir Storm Drain Repair  COK-04

 $30,000

Deer Flats
  Deer Flats Park Replace Swing  DF-02

 $6,500

  Deer Stalker Path Cross Gutters  DF-03

   $45,000

Del Monte Beach
  DMB Boardwalk Replacement Phase II  DMB-02

 $7,500

Del Monte Grove – Laguna Grande
  Ramona Entry Island  DMG-01

 $37,000

  DMG Ramona Neighborhood Entry Sign  DMG-02

 $7,000

Downtown
  No Projects  

 

Fisherman Flats 
1430 Augusta Outfall Rehab  FF-01

 $15,000

  FF Replace Catch Basins  FF-02

 $46,000

  Via Casoli Sidewalk   FF-04

 $30,000

Glenwood
  No Projects  

 

Monterey Vista
  Logan One Way Study  MV-02 

$5,000

  Via Paraiso Park Small Play Equipment Replacement  MV-04

$35,000

  Sierra Vista Resurface/Drainage Improvements (Combined MV-08 & MV-10)  MV-08

$77,000

  Via Gayuba Sidewalk (Mar Vista/Colton)  MV-16

 $120,000

  Monterey Vista Radar Speed Sign   MV-17

 

 $15,000

New Monterey
  Base Radio/Tower Upgrades  NM-01

 

 $3,000

  David/Terry Extended Curbs/Crosswalk & Median Phase II  NM-02

 $65,000

  Taylor Hoffman Archer Walkway Repair                 
(Combined NM-03, NM-06, & NM-09)
 NM-03



 $122,000

  Prescott/Parcel Bulbs  NM-04

 $105,000

  Scholze Park Streetscape Improvements
(Combined NM-10 & NM-11)
 NM-10


 $185,000

  Oak Newton Park Security Light Replacement  NM-12

 $15,000

  Archer Park Walkway Improvements   NM-13

 $10,000

  Rec Trail/Cannery Row Crossings Phase I   NM-18

 $70,000

Oak Grove
  Aguajito/10th Sidewalk/ADA Ramp  OG-01

 $30,000

  Oak Grove 4th 1100 Block Drainage Improvements   OG-04

 $55,000

  Lake St Storm Drain Repair   OG-06

 $4,000

  Aguajito/7th to Lake El Estero Storm Drain Repair   OG-07

 $5,000

Old Town
  Franklin/Larkin ADA Ramps  OT-01

 $138,000

Skyline Forest
  Skyline Forest Greenbelt Fuel Reduction  SF-01

 

 $50,000

  Wyndemere Lower Canyon Drainage Phase I  SF-02

$235,000

Skyline Ridge
  No Projects       
Villa Del Monte
Ramona/Neighborhood Sidewalk Repair  VDM-01

 $60,000

Palo Verde/Lake Del Monte Storm Drain Repair

 VDM-04

 $36,000

  Ramona Radar Speed Signs  VDM-10

 $30,000

Citywide
Monterey Sports Center Recoat Pool Deck  CW-01

 $35,000

  Sollecito Ball Park Infield Artificial Turf  CW-02

 $125,000

Dennis the Menace Park Replace Moon Bridge  CW-03

 $50,000

El Estero Lake Edge Improvements PH V  CW-05

 

$100,000

Munras/Soledad Freeway Entrance Signage  CW-06

 $15,000

Dennis the Menace Walkway/Access Improvements PH II  CW-07

 $65,000

  Monterey Bay Park Seat Wall/Irrigation  CW-08

$16,500

El Estero Park Replace Exercise Course Equipment  CW-09

$35,000

CERT Box Repair  CW-10

 $10,000

  CERT Box Relocation  CW-12

 $10,000

  El Dorado/Major Sherman Storm Drain Rehab  CW-13

 $70,000

  Jacks Ball Field Light Upgrade   CW-19

 

 $159,000

  Library Study/Group Area   CW-22

 $40,000