What's New

What's New lists City of Monterey or City of Monterey-sponsored events, office updates regarding city programs and services, news releases and city meetings. Other events around the community can be found at the Monterey County Convention and Visitor's Bureau, www.seemonterey.com.

I-SEARCH MontereyThe City Meetings Calendar lists meetings for City Council and Planning Commission. They can also be found on the Meetings tab at isearchmonterey.org. Dates are posted 3 days prior to the upcoming meeting.

For the very latest, Twitterfollow us on Twitter


News Search

08:00 05 August 2017
San Francisco Get Acquainted Trip, Saturday, August 5

San Francisco Get Acquainted Trip, Saturday, August 5

Presidio Leisure Travel Services program invites you to come along and visit our neighbors to the North, the “City by the Bay”.  There’s so much to explore in San Francisco. 
Saturday, August 5, 2017

See flyer for details

Export event8/5/2017 8:00 AM - 6:30 PM
10:30 24 July 2017
Seeking Applications for Planning Commission and Measure P Oversight Committee

Seeking Applications for Planning Commission and Measure P Oversight Committee

Monterey, CA. – The Monterey City Council is encouraging Monterey residents to apply to serve on the Planning Commission and the Measure P Oversight Committee to fill two unscheduled vacancies. News Release in PDF.

Export event7/24/2017 10:30 AM - 8/7/2017 5:00 PM
17 July 2017
NEW Online Services from the Monterey Police Department
12 July 2017
07/12/2017: Assault and Carjacking

07/12/2017: Assault and Carjacking

On July 12, 2017 at approximately 4:37 a.m., Monterey Police Officers were dispatched to the 300 block of Calle Principal on a report of an assault and carjacking which had just occurred.

10 July 2017
07/10/2017: City of Monterey Accepting Special Event Grant Program Proposals

07/10/2017: City of Monterey Accepting Special Event Grant Program Proposals

The City of Monterey will be accepting applications for a Mid-Year Special Event Grant Program until 5:00 p.m. on Friday, July 28, 2017 for events scheduled during Fiscal Year 2017-2018 (Sep 1, 2017 through June 30, 2018).

07 July 2017
07/07/17: City of Monterey Records Monterey Pop Festival Memories

07/07/17: City of Monterey Records Monterey Pop Festival Memories

The City of Monterey is celebrating the 50th anniversary of the Monterey International Pop Festival and the Summer of Love by launching a “community stories” series. Twenty-one community members recorded their memories about attending the iconic festival. News Release in PDF

02 July 2017
06/30/2017: Monterey Police Lobby to Close for Construction

06/30/2017: Monterey Police Lobby to Close for Construction

The Monterey Police Department Records Lobby will be closed for construction on July 6, 2017 and is expected to reopen mid-August 2017. A temporary Records lobby will be located in the modular building in the rear Police parking lot. The temporary lobby will be open Monday through Friday, between the hours of 9 a.m. and 6 p.m.

30 June 2017
Notice of Intent to Adopt a Negative Declaration - Detention Basin Management Project

Notice of Intent to Adopt a Negative Declaration - Detention Basin Management Project

June 28, 2017

NOTICE IS HEREBY GIVEN that the City of Monterey has prepared a Negative Declaration, pursuant to the requirements of CEQA, for the City of Monterey Detention Basin Management Project.  The proposed Negative Declaration and Initial Study, as well as referenced documents, are available for review at the City of Monterey, Planning Office, Colton Hall, 1st Floor, 570 Pacific Street, Monterey, CA 93940 and on the City website at: http://www.monterey.org/Services/Planning. In accordance with time limits mandated by State law, written comments on this Negative Declaration and Initial Study will be accepted from:

July 3, 2017 – August 2, 2017

Notice of Intent to Adopt a Negative Declaration | Initial Study

RSS
12345678910Last

Week beginning
July 24:

Please note: Weather may cause possible delays or changes to the schedule.
Active Engineering Projects Schedule
MAP OF ALL PROJECTS
  • Alvarado Street Light Replacement - 26 street lights between Bonifacio and Del Monte - Replacing fixtures with LED lights that are energy efficient and have a very long lifespan. Conforms to the Downtown Master Plan and has dimming capabilities. Starts Monday and expected to take four to six days. Little to no impacts to thoroughfare or noise level. (CIP)
  • Pearl Street Bridge Improvements -  replace walk path  (CIP)
  • 442 Casanova Avenue Sidewalk reconstruction, stump removal, curb and gutter ADA work all week (CIP)
  • 300 Block of Belden Street Widening Week two of 6 to 8 until completion - SEE CONTRACTOR SCHEDULE AND NOTICE (NIP)
  • MEASURE P STORM DRAINS: Citywide Storm Drain Repairs Phase 3 Storm drains on Walter Colton Drive near the school - next up - Soledad Drive at Soledad Place - potential road closure at times - dates still to be determined
  • MEASURE P STREETS: Citywide Street Resurfacing/Slurry Phase 4 Phase 4 completed...phase 5 up next...details coming soon
  • MEASURE P SIDEWALKS: Citywide Sidewalk Repair Phase 3 - Small sections on Pacific, Tyler and Polk streets
  • MEASURE P ADA: Citywide ADA Ramps and Street Reconstruction, Phase 3 - Mostly completed; just line markings in some areas.
  • Wharf II Pile Replacement & Repair - Piles will be driven. Impacts to parking and traffic on the wharf. SCHEDULE in PDF (CIP)
  • Veteran's Park Bocce Ball Court (NIP)
  • Police Department Lobby UpgradesSee news release for details Lobby expected to re-open mid August.
  • Cal Am Monterey Pipeline Project (Non-City Project) - also see www.watersupplyproject.org/
    Pipeline construction will continue Madison Street in Monterey between Van Buren and Pacific Street. Crews will begin mobilization work in Pacific Grove near Sinex and Eardley Avenues. Appurtenance crews will move to Monroe Street in Monterey and continue work on Hilby Avenue. Paving will begin on North Fremont Street between Casa Verde and Hilby Avenues.
    Have a question or concern? Call the CalAm project hotline at: (831) 646-3297
  • Highway 68/Highway 1 Roundabout (monterey.org/hh68)
    Next week crews will be focusing landscaping work, sidewalk work, as well as paving along southbound Highway 1 behind the concrete barriers under the Holman Highway 68 overpass. On Tuesday, crews will be pouring concrete for the last splitter island on the southbound highway 1 off-ramp. This work will require closing the free right turn lane of the off-ramp (going towards Pacific Grove) from 10 a.m. – 3 p.m. Drivers going towards Pacific Grove from the southbound Highway 1 off-ramp will need to proceed to the roundabout and make a right turn onto westbound Holman Highway 68.
    On Friday, crews will be working on a trench drain near the entrance to the Carmel Hills Professional Center, but no lane closure is currently planned for this work.
    Sign Up for Text Message Alerts - Text 68roundabout to 888777

    Sign-up to receive email notifications: www.tamcmonterey.org. TAMC will send a weekly “look-ahead” with info about the construction, road closures, detours, traffic conditions and travel options.
    HH68 Roundabout May Take Longer

construction signs

Ongoing


Upcoming

  1. Lower Presidio Historic Park Accessible Walkway up to the Sloat Monument (NIP)
  2. MEASURE P: ADA Ramp and Street Reconstruction Phase 4 on Littlefield, El Dorado and Pacific (Measure P) - early Sep
  3. MEASURE P STREETS: Citywide Street Resurfacing/Slurry Phase 5

CalTrans may be performing other work locally. Look up CalTrans construction.