Construction Construction of the Hotel Clement, 2007

The City of Monterey's Storm Water Ordinance (Municipal Code Chapter 31.5 Article 2) requires all construction site owners and contractors to implement storm water best management practices (BMPs). BMPs prevent pollutants generated during construction from leaving the construction site and entering the City's storm water system during wet or dry weather. BMPs help protect the Monterey Bay National Marine Sanctuary!

Storm Water BMP Inspections

City staff perform stormwater inspections of construction sites. Two different inspection forms are utilized depending on the size of the site. They are provided below for owner and contractor review:

Below are links to online construction BMP guidance documents:

About the Construction General Permit ("CGP")

Regulated by the State Water Resources Control Board (SWRCB), larger projects are required to obtain coverage under their Construction General Permit (CGP) prior to the issuance of a construction activity permit locally. Larger construction projects (including linear projects) are those that disturb one or more acres of soil or whose project disturbs less than one acre and is part of a larger common plan of development. 

These projects also require a Stormwater Pollution Prevention Plan (SWPPP) to be submitted to the SWRCB and the City's Plans and Public Works Department for review prior to permit issuance. Lean more about the CGP and SWPPP requirements at the SWRCB Construction Stormwater Program website.

Report Sanitary Sewer Spills and Illegal Dumping

To learn more about the City's Construction Site BMP Review and Inspection Program, please contact:
Permits & Inspection Services at (831) 646-3890, or the Environmental Regulations Manager at (831) 646-3921.